Increasing Batch Size and Reducing Cycle Times for a Biologic

Challenge

An existing partner wanted to work with JHS to
investigate new ways to reduce the cycle time of a
biologic product in order to serve more patients.

Approach

JHS has worked with this top 20 global pharma
partner for 15+ years on this drug product and
searched for new solutions for greater efficiency to
manufacture and deliver more batches. Together,
JHS and the partner held a process mapping
exercise covering every step from receiving API
shipments to final inspection and packaging. By
implementing the findings from the exercise, both
JHS and the client were able to reach more
patients.

DOWNLOAD THE PDF TO READ THE FULL CASE STUDY

Related Posts

Fill Profile Development Lowers Reject Rate for Lyophilized Product

Fill Profile Development Lowers Reject Rate for Lyophilized Product

See how smarter filling saved a biologic from a double-digit reject rate.  A small amount of liquid left on the vial wall can mean a costly reject, especially when a high-value API is on the line. For one client's high-value biologic, that meant reject rates reaching...

Lyo Cycle Development Ensures Success for Oncology Drug Scale-Up

Lyo Cycle Development Ensures Success for Oncology Drug Scale-Up

Find out how engineering-led cycle development bridged the gap from benchtop to validated-scale up. What works on a benchtop doesn't always survive the jump to a large-scale lyophilizer. See how JHS engineers identified the root cause of a failed PPQ validation run...