Case Studies

Case Study: Zero Deviations on an Expedited Timeline

Zero Deviations
JHS successfully and rapidly produced a clinical trial batch and three process validation batches for a client working under US Operation Warp Speed producing COVID-19 vaccines.

Related Posts

Case Study: Re-engineering a Complex Process for FDA Compliance

Case Study: Re-engineering a Complex Process for FDA Compliance

JHS acquired the tech transfer for a COVID-19 liquid suspension vaccine product that was approved for use internationally, but not within the United States. This transfer was completed in less than half the time typically required. The challenge was developing a...

Case Study: Meeting Raw Material Needs

Case Study: Meeting Raw Material Needs

Supply chain issues have plagued nearly every industry since the COVID-19 pandemic. Learn how JHS resolved production loss-risk with their experienced and nimble teams by discovering in-facility material alternatives.

Case Study: Expediting Cold Chain Supply Resources

Case Study: Expediting Cold Chain Supply Resources

A COVID-19 therapeutic product required a very large quantity of compounding materials to be stored under refrigerated conditions. The need was far greater than JHS’ existing capacity for cold storage given the scale of the pandemic. Learn how JHS found cold storage...